View or request construction file or construction drawing
What is it?
You can request copies of construction drawings of existing structures from the municipality. A copy of a construction drawing is important if you want to know, for example, whether you can remodel a house.
How does it work?
What does it cost?
Many construction files are digital in our archives and can be sent to you digitally. If a construction file is not yet digital, it will be scanned and sent to you digitally. There are search and scan costs associated with this work.
Chapter 10 Municipal Archives | |
The rate is for making searches on request in the documents held in the municipal archives, for each quarter-hour spent thereon | € 23,00 |
Chapter 20 Miscellaneous | |
The fee is for processing an application: | |
to obtain copies, carbon copies or photocopies of documents, to the extent that a rate is not provided for this purpose elsewhere in this table or in another legal regulation: | |
per page on A4-sized paper | € 0,10 |
per page on A3 size paper | € 0,20 |
per page on A2, A1 or A0 size paper | € 10,55 |
If the requested as referred to in 1.20.2.2.1 or 1.20.2.2.2 is sent digitally then the rate per page is | € 0,10 |
of Maps, drawings and lithographs, whether or not belonging to the documents mentioned in sections 1.20.2.1 and 1.20.2.2, to the extent that a rate is not provided for them elsewhere in this table or in another statutory regulation, per Map, drawing or lithograph with an area of: | |
- size A4 | € 1,65 |
- size A3 | € 1,75 |
- size A2, A1 or A0 | € 10,55 |
How long does it take?
Most drawings (and other attachments) are available digitally and are sent by e-mail. For this we often use the service 'WeTransfer'. You will then be sent an e-mail with a link, with which you can download your copies. This link is valid for seven days.
For drawings yet to be digitized, there is a longer handling time, because files must be requested first. These drawings are scanned and then sent digitally. Please allow for a handling time of approximately two weeks.
Applications are processed in order of receipt. In case of heavy traffic, you may have to wait longer for the requested documents.